Skip to content
Home/Blog/Delhi to Vadodara by Expressway: Crossing the Last Gap
Travel Guide

Delhi to Vadodara by Expressway: Crossing the Last Gap

One piece is missing from the Delhi to Vadodara expressway drive. Package 26, about 30 km between the Madhya Pradesh–Gujarat border and Bhimpura near Limkheda, isn't open. Everything else on the 912 km Delhi–Vadodara section of NE-4 is.

That's a big change since March. On 25 March, road transport minister Nitin Gadkari told the Rajya Sabha that 697 km of the 912 km was operational. Since then Vadodara–Godhra has opened (trial in April, official in May), the DND–Jaitpur link in Delhi opened on trial in August, and Limkheda–Godhra opened in October.

What's continuous today

| Run | From | To | Status | |---|---|---|---| | North | Delhi (DND Flyway or Sohna) | Thandla interchange, Jhabua district, MP | Continuous, per DeshGujarat | | Gap | Thandla | Hathidhara interchange, Limkheda | Package 26 not open | | South | Limkheda | Kharel, Navsari district | Continuous since October |

The Thandla interchange is on SH-39 at Manpur village. Heading south, it's the last exit you can use before the gap. Heading north, Limkheda's Hathidhara interchange is where the open road ends.

The highway that links the two ends

We couldn't find an NHAI advisory naming an official diversion.

On the map, though, one national highway joins the two towns. NH-147D runs 157 km between Limkheda in Gujarat and Badnawar in Madhya Pradesh, through Limdi, Talava, Thandla and Petlavad, according to its Wikipedia entry. It's a branch of NH-47, which it meets near Limkheda.

So the obvious detour southbound is: leave NE-4 at Thandla, head west on NH-147D through Talava and Limdi, and rejoin at Limkheda. Northbound, do it in reverse.

Indian Masterminds described the same situation more generally in August. Until Package 26 opens, drivers going beyond Limkheda towards Madhya Pradesh have to leave the expressway, use another road and rejoin in Madhya Pradesh.

Check a live navigation app before you set off. It may suggest a route through Dahod, about 25 km east of Limkheda. These are ordinary two-way roads through towns and villages, shared with local traffic and slow vehicles, so the average speed drops a long way below what you've been doing on the expressway. Be careful after dark.

Going to Ahmedabad instead

The same gap applies if you use NE-4 for a Delhi–Ahmedabad trip. NE-4 meets the Ahmedabad–Vadodara Expressway (NE-1) at the Dodka interchange in Vadodara district. So the route is Thandla, NH-147D, Limkheda, south past Godhra to Dodka, then onto NE-1. Whether that beats the older route through Rajasthan on NH-48 depends on where in Delhi you start, and we haven't seen a reliable comparison.

Fuel before the gap

There's no fuel, food or repair service on the Limkheda–Godhra section, according to both Indian Masterminds and DeshGujarat. Southbound, fill up before you leave NE-4 at Thandla. Northbound, fill up in Vadodara or Godhra.

North of Thandla, the facilities are what they've been since the Madhya Pradesh section opened in 2023. Our rest stops guide covers what's actually built along that stretch and what's still only planned.

When the gap closes

DeshGujarat reported on 13 October that Package 26 should be finished "by December this year or January next year." Wikipedia's project page also cites a December 2026 expectation for the Delhi–Vadodara section.

Those dates have slipped before. In February, Gadkari told the Lok Sabha the Delhi–Vadodara section would be done by May 2026. His March reply to the Rajya Sabha said June 2026. Our construction tracker lists Package 26 as a 30 km job by Atlas Construction and NKC, working as a joint venture.

Once it opens, NE-4 will run without a break from Delhi to Kharel in Navsari district. For anyone driving between Delhi and Vadodara, Bharuch or Surat, that will be the first fully continuous expressway trip.

South of Vadodara

If you're going on to Mumbai, the expressway continues past Bharuch and Surat to the Kharel interchange near Gandeva, and stops. The next 90 km to the Maharashtra border, Packages 8, 9 and 10, are years behind. Our piece on the stalled Gujarat packages explains why. From Kharel, Mumbai-bound traffic uses NH-48 through Valsad and Vapi.

Before you leave

  • Southbound, plan to exit at Thandla. Northbound, at Limkheda's Hathidhara interchange.
  • Fill the tank before the gap.
  • The Limkheda toll plaza was scheduled to start charging on 1 November. We haven't seen confirmation that it has.
  • Pick your joining point in Delhi from our entry and exit list.

Sources: DeshGujarat, 13 Oct 2026; Indian Masterminds, 25 Aug 2026; Business Today, 4 Nov 2026, on Gadkari's 25 March Rajya Sabha reply; DeshGujarat, 13 Feb 2026; DeshGujarat, 20 May 2026; Wikipedia, NH-147D; Wikipedia, Limkheda. Interchange locations from the expressway's Wikipedia entry.